Bean bag Sitting Point Beanbag Alfa XL approx. 220 liters wine red 70x110 cm

Bean bag Sitting Point Beanbag Alfa XL approx. 220 liters wine red 70x110 cm

SAR 325.00
+ SAR 1,077.00 Air Shipping

  • Includes any applicable VAT and customs duty.
  • Air shipping cost to be recalculated with delivery address at checkout.
  • To be delivered in 6 - 9 * working days.
  • 100% genuine and new product.
  • Card payment to be settled in SAR. No conversion fee.
  • Credit card
Description
The beautifully designed bean bags from Sitting Point are ideal for any situation. Individual, high quality, robust.
The bean bag filling is made of 100% polystyrene (PS for short) is of the highest quality and ensures perfect seating comfort for young and old.
The filling is replaceable and refillable.
Product Information
  • EAN :
  • Size :
  • Colour :
  • Height :
  • Series :
  • Weight :
  • Item type :
  • Basic color :
  • Fabric quality :
  • Material cover :
  • Decor / Pattern :
  • Dimensions (WxH) :
  • Material filling :
  • Care instructions :
  • Material composition :
  • Depth x width (approx.) :
  • Area of ​​application :
Images
-
-
-
-
Reviews

Be the first to review. Login

Bean bag Sitting Point Beanbag Alfa XL approx. 220 liters wine red 70x110 cm

SAR 325.00
+ SAR 1,077.00 Air Shipping
  • Includes any applicable VAT and customs duty.
  • Air shipping cost to be recalculated with delivery address at checkout.
  • To be delivered in 6 - 9 * working days.
  • 100% genuine and new product.
  • Card payment to be settled in SAR. No conversion fee.
  • Credit card
Available Options
Share on: